This project included the design and construction of a pond perimeter path (about 1.7 miles) and a 0.8-mile ADA-accessible path connecting to the perimeter path, which links to an inclusive playground and parking area. Located within a wetland, our team worked closely with engineers and wetland mitigation consultants to secure the necessary permits and develop a design that addressed the ecological constraints. Other project elements included a restroom, pavilions, interpretive signage, a great lawn, benches, a bird-watching area, and bioswales.
This project included the design and construction of a pond perimeter path (about 1.7 miles) and a 0.8-mile ADA-accessible path connecting to the perimeter path, which links to an inclusive playground and parking area. Located within a wetland, our team worked closely with engineers and wetland mitigation consultants to secure the necessary permits and develop a design that addressed the ecological constraints. Other project elements included a restroom, pavilions, interpretive signage, a great lawn, benches, a bird-watching area, and bioswales.